XTO Energy Achieves 100 Percent Work Completion Rate With eMaint X3 CMMS

Register Now to Download this FREE Case Study

XTO Energy Achieves 100 Percent Work Completion Rate With eMaint X3 CMMS

At the time Doyle joined XTO Energy, there was no formal system in place for tracking preventive and corrective work orders or measuring backlog and work completions. Doyle needed a system that would allow operators to report issues at any time during their shift and enable Doyle to assign work based on priority and skill. This includes submitting emergency work requests in the middle of the night, since the plant runs 24 hours a day. With their former hand-written system, work requests often got misplaced and were left unattended.